How a project runs
Direct access to the pharmacometrician, full visibility, and response times written into the proposal.
Service levels
Step by step
A written update every week. Meetings only when a decision is due.
- 01
Scoping call
The question, the data and the regulatory context, with the pharmacometrician who would do the work.
- 02
Fixed proposal
Scope, deliverables, delivery date and price.
- 03
Analysis plan
Question, context of use and acceptance criteria, approved before modeling starts.
- 04
Modeling
Every run logged and reproduced; every decision recorded.
- 05
Report
Report, M15 assessment table, code and data. Revisions until you sign off.
- 06
Agency interaction
Briefing-document sections and support through the meeting.
The project page
Status, run log, decisions and deliverables in one place, with an optional Slack or Teams channel.
Status
Next milestone
Run log
- run 021 · E-R efficacy, Emaxverified
- run 020 · E-R safety, logisticverified
- run 019 · E-R efficacy, linearre-executing
Decisions log
- D-11 Cavg,ss as exposure metric, per MAP §4.2signed
- D-12 Exposure for 3 patients without PK samples predicted from dose historysigned
Deliverables
- MAP v1.2 (approved)PDF · DOCX
- Analysis dataset v3 + define.xmlXPT
- Interim results memoPDF
Open questions
- Q-04 Dose-reduction dates for site 112?with you
- Q-05 Confirm the safety endpoint definitionanswered
Working with your CRO
Keep your CRO for operations and data management; bring the modeling to us.
SDTM, ADaM or raw
With specifications. We build and double-program the analysis dataset.
Agreed, analysis-ready data
The delivery date runs from receipt of the data agreed in the plan. Gaps are flagged in writing before the clock starts.
Data-readiness checklist
Dosing, sampling times, BLQ flags and units.
Available on request.
Continuity
- A second pharmacometrician follows every active project.
- A handover package at every milestone: data, code, logs and the current draft.
- Everything is yours, and can be re-run by anyone.
Talk to the person who would do the work
A fixed proposal follows within 48 hours.